Discuss a project

QQDEV · KYRGYZSTAN · REMOTE

The deal was cancelled: what happens to existing tasks?

Review outstanding assignments after a sale is cancelled and agree which work stops and which actions must still be completed.

Published

4 min10

Hypothetical example. A customer cancels a project and the manager closes the deal, but a designer continues preparing a layout under a task created earlier. Their list looks normal: a description and deadline are present. The cancellation news stayed on the other side of the screen.

To stop unnecessary work, review both the final deal stage and the assignments it has already generated. Some actions are no longer needed; others remain part of your agreed work process. Test the idea of “close everything” against concrete examples first.

Mistake one: treating the final stage as a message to everyone

List the actions around one practice deal. Include tasks created by automation, manually and by an external integration. An automation rule performs an action such as creating a task when a deal enters a stage. Each assignment needs an understandable source and connection to the sale.

Ask the assignee how they learn that an order was cancelled. Do not assume they open CRM before every step. If the manager communicates the decision, define where the message goes and who confirms work has stopped. For teams in Kazakhstan and Kyrgyzstan, identify department owners and shift handover arrangements.

In our hypothetical example, the designer needs to stop preparing the layout and record the materials’ current state. The task note should explain why work ended. Otherwise completion could look like acceptance of finished work even though the output is no longer required.

Mistake two: completing every assignment in the same way

Divide actions into three groups. First, work that lost its purpose after cancellation. Second, actions still requiring completion, such as handing over prepared materials under the agreed process. Third, new actions caused by cancellation: notifying participants or checking that a reservation is released, where one existed.

Assign a rule and owner to each group. Do not delete history merely to remove an unwanted task from the list. Retain enough information about the actual state and decision. Where contractual obligations are involved, the contract owner reviews them separately rather than leaving them to an incidental stage transition.

Do not select tasks by similar names alone. One task may contain work for several orders, while different tasks may share a title. Before automatic completion, check the actual links and work scope so a neighbouring project is not stopped alongside the cancelled one.

How to test the standard task completion rule

In Bitrix24, the Complete Task automation rule works with tasks created by other automation rules; its settings select their originating pipeline and stages. Official task automation guide. Compare that scope with your assignment list before putting the action on a final stage.

Check automation availability on your plan and the specialist’s permission to edit it. Agree which originating stages can be included. Decide separately what happens to manual tasks and external system assignments: do not assume they were handled just because the standard rule ended without an error.

Create practice tasks from the different sources on a practice deal. Move it to the agreed cancellation stage and open the tasks themselves. Compare the changes, information received by assignees and the recorded reason. Verify the actual workload after transition, not merely the presence of a rule in settings.

Mistake three: forgetting the deal may return to work

A customer may change their mind, or a manager may correct a wrongly selected stage. Decide beforehand what happens to earlier tasks. Do not promise automatic resumption: demonstrate it in a practice scenario or appoint an owner to create a new assignment.

Test re-entry to preparation and another cancellation. There should be no unexplained duplicates or ownerless assignments. If work was partially done, the new assignment should use the retained result rather than make the employee start from a blank page.

Keep a map of each task’s source, deal link and actions on cancellation and reopening. Start with one pipeline where the issue actually affects work. Show QQDev an anonymised deal and several outstanding tasks to discuss a Bitrix24 automation audit and exception setup. Review the automation with QQDev.

← All blog posts