How to approve a sample before production starts

Link the customer’s approval to a specific sample and properties so the person doing the work does not have to choose from a chat.

Published

3 min10

A hypothetical example. A customer chooses material for a sign and tells the manager, “This one works.” Three photographs appear above the message. Later, the person doing the work opens the conversation and picks the newest image. Everyone acted in good faith, but nobody had a shared answer to “which sample exactly?”

Start with a simple approval record linking the sample, properties being checked and decision. A spreadsheet can be enough initially. CRM, a system for managing customer relationships, can place that record beside the order, but does not determine technical suitability instead of a specialist.

What exactly should the customer approve?

Separate appearance from other requirements. Approving a shade does not mean approving dimensions, fixing methods, package contents or operating conditions. List the properties genuinely checked at this stage and the questions that remain open.

Give the sample a clear reference and version. Add the physical sample’s storage location, if one exists, and a link to the agreed file. Do not call every option “final”: that title lasts only until the next message.

In Kazakhstan and Kyrgyzstan, teams may discuss an order in different languages. Clarify property meanings and units in the working document. If photographs are viewed on different screens, do not treat them alone as evidence of an exact colour match: agree the verification method with a relevant specialist.

Where can people see the decision and its limits?

Record who approved the sample, when and for which order. Alongside it, state precisely what was approved, the decision’s source and remaining conditions. A short “yes” helps only when linked to a clear question and an unambiguous option.

If formal approval is needed, document procedures and participants’ authority must be defined separately. A dated CRM entry does not become a signature or legal confirmation simply because it has a timestamp. Do not replace the agreed procedure with a convenient button.

When an option changes, preserve the earlier history and identify what needs approval again. A new photograph must not silently replace the material already used by the assignee. Appoint one person to communicate version changes and check that the new information was received.

How can Bitrix24 organise the check?

If the portal is already used, keep approval information in an appropriate order record and assign a pre-handover review task. Its description should state the sample reference, properties to check, decision source and expected outcome. How to create a task.

Check field settings, files and permissions in your own portal and plan. The assignee needs accessible materials of the correct version rather than access to all company conversations. A completed task records a check under your process; it does not guarantee that the physical sample matches a photograph.

How can the process be tested before a real order?

Create a training example with two similar options. Ask a colleague, without hints, to name the selected sample, approved properties and unresolved questions that prevent work starting. Then change one parameter and check whether the need for a new decision is clear.

If the colleague answers confidently, show them the documents and materials that the real assignee will receive. Test links with that person’s permissions. If an oral explanation is essential, improve the record before discussing automated handover.

Start by describing one approval on paper with several meaningful but anonymised options. Discuss records, tasks, permissions and team training with QQDev as part of Bitrix24 implementation, even if you currently use only a spreadsheet and chat. Discuss approved sample handover with QQDev.