The task took a week. Was it work or waiting?

Separate effort from elapsed duration and agree timer rules so the report helps plan work.

Published

3 min18

Illustrative example: an employee prepares a draft, waits several days for approval and makes revisions. The task remains open for a week. Looking at dates, the manager asks why a simple job took so long. The answer depends on what was measured.

Elapsed duration shows the journey from start to finish. Effort is the time people spend on actions. Both measures help, but neither replaces the other.

Agree what counts first

Define which actions belong to a task: preparation, substantive discussion, checking and corrections. Decide separately how to represent waiting for information or a decision.

When an employee switches to other work, timer rules should reflect that. Do not require a running timer simply to produce an attractive continuous bar.

Different task complexity and incomplete entries make comparisons based on hours alone unreliable. Review work content and recording completeness before drawing conclusions.

What Bitrix24 provides

Task time tracking supports planned time and recorded actual effort. Participants can work simultaneously and their effort is added together. Manual entries are possible when needed.

Several people's total can therefore exceed the elapsed duration of their joint work. That is not necessarily an error. Check whether the report shows person-hours or a time interval.

Before configuration, check feature availability, permissions and your portal's interface. An instruction does not establish identical capabilities on every plan.

Give waiting a clear reason

“Waiting” should explain what the team needs, who requests an answer and when the next step is checked. Otherwise the timer stops while the task remains motionless.

Illustrative example: confirmed input is needed from an owner. Record the request and a review date. Long waiting can then be examined as a process issue rather than attributed to execution effort.

Do not add retrospective hours merely to fill an entire working day. If accurate recording was missed, use an agreed correction process and record its basis.

Run a short experiment

On a training task, start work, pause, add a manual interval and involve a second participant. Compare history and totals with what the team expects.

Check task completion and participant timer behaviour. Then review the result using the account of the person who will read the report: permissions and views can affect available information.

For a team in Kyrgyzstan, agree time zones and entry formats. When people work different days and hours, the calendar's midnight boundary must not confuse the meaning of effort.

Start with one type of work

Take a few similar tasks and compare the plan, actual actions and waiting. Discuss obstacles to accurate recording and what would improve planning for the next stage.

If reports cause more arguments than clarity, discuss task tracking with QQDev. Start with one Bitrix24 work scenario and recording rules. The aim is to explain the process, not turn a timer into a contest in accumulating hours.